A deployment engineer is discussing the benefits of the PowerEdge XE9680 to a data center manager. A customer has many PowerEdge servers. They require the greatest amount of network throughput possible. The manager asks how many PCle risers and network PCI cards the server can support.What should be the response?
A deployment engineer is installing eight PowerEdge XE9680 servers. Two servers will be installed in each of four racks. The data center managers must plan for the power needed to supply power to the four racks.What power consumption information can the deployment engineer give the data center manager?
A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cable management arm (CMA).What are two items to consider when installing a CMA?The CMA can be installed to open on either the left or right side of the server.Do not route optical cables through the CM
A deployment engineer is installing a PowerEdge XE8640 server. The rack has four PDUs. Looking at the rear of the rack, one power source provides power to the two left PDUs. A different power source provides power to the two right PDUs.What side of the rack should XE8640 PSU 1 and PSU 2 be connected?
A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail assemble that are secured in the rack. The engineercan only push the server into the rack a short distance before it stops. Pushing forcefully causes the rack to slide back.What action should the deployment engineer take?