A vSAN administrator has two identical VMware vSAN clusters, one for staging workloads and another for production workloads. Due to an unforeseen capacity requirement, the vSAN administrator is tasked with merging the staging vSAN cluster into the production.Which three actions should the vSAN administrator perform on the staging cluster prior to moving the vSAN nodes to the production cluster? (Choose three.)
A vSAN administrator is using the vSAN ReadyNode Sizer to build a new environment. While entering the cluster configurations, a fellow colleague inquires about the Operations Reserve option.What is the purpose of using this option?
The Resyncing Objects view in the vCenter UI reports that some objects are currently resyncing. Which two actions would cause this situation? (Choose two.)
An existing vSAN OSA cluster has this specification:Four ESXi hosts with all flash configuration Each with two disk groupsEach disk group with one cache device and four capacity devices There are five more device slots available per hostThe CTO would like to provision new applications, and these will need more capacity and performance.Which two methods should be used by the vSAN administrator to meet this goal with the least amount of impact? (Choose two.)
An architect is designing a vSAN stretched cluster and needs to ensure that data remains on a given site in case of a network partition between the sites.Which configuration would do this?